CONCRETE BARRIER PROJECT
Focuses on providing durable and precisely engineered barriers designed for safety, stability, and long-term performance in industrial and roadway applications. Each barrier is fabricated using high-quality materials and reinforced concrete to ensure superior impact resistance and reliability. With careful attention to design and construction standards, our team delivers cost-effective, sustainable, and customized solutions that meet client specifications and enhance site protection and traffic control.

DE-AERATOR PROJECT
Designed to enhance the efficiency and reliability of geothermal power plant operations by effectively removing dissolved gases such as oxygen and carbon dioxide from the feedwater system. This process prevents corrosion in boilers and piping, ensuring longer equipment life and stable plant performance. Our team handled the fabrication, installation, and testing of the deaerator system in strict compliance with engineering standards and safety protocols.

FABRICATION OF DISCHARGE TEST GEARS
Was developed to support the performance testing and maintenance of geothermal power plant systems. These test gears are engineered to regulate and measure fluid discharge under controlled conditions, ensuring the reliability and efficiency of geothermal well operations. Our team fabricated the equipment with precision and high-quality materials, meeting all industry and safety standards.

TWIN CYCLONE SILENCER
Was designed and fabricated to minimize noise emissions generated from steam discharge systems in geothermal power plants. Engineered with dual-stage cyclone chambers, the silencer efficiently reduces high-pressure steam noise while maintaining optimal flow performance. Constructed from high-grade stainless steel and fabricated with precision welding techniques, the unit ensures durability, corrosion resistance, and long-term reliability under geothermal conditions.

GRS RETROFITTING PROJECT
Focused on reinforcing the existing structure through the addition of new structural members to enhance stability and load-bearing capacity. This work ensured that the Gas Removal System (GRS) framework met updated design and safety standards without disrupting ongoing operations. All fabrication and installation activities were performed with precision and strict adherence to structural specifications and geothermal site safety protocols.

SCRUBBER DRAIN TANK PROJECT
Involved the design, fabrication, and installation of a specialized tank system for collecting and managing condensate and impurities from geothermal scrubber units. The tank was engineered to handle high-temperature and corrosive fluids, ensuring safe and efficient operation within the geothermal process cycle. Constructed from high-grade stainless steel and fabricated under strict quality and safety standards.

SS1 AND SS2 RETROFITTING ACTIVITY
Involved the strengthening and modification of existing support structures to enhance their durability and performance under operational conditions. The work included the installation of additional structural members, realignment, and reinforcement of key components to meet updated design and safety standards. Fabrication and installation followed geothermal plant standards, ensuring minimal downtime.

STEAM WASHING SYSTEM PROJECT
Involves the design, fabrication, and installation of a complete system for cleaning geothermal pipelines and equipment using high-pressure steam. The project aims to improve plant efficiency and equipment reliability by removing mineral deposits and impurities within the steam network. All works met geothermal standards, ensuring safety, efficiency, and long-term system integrity.